相似文献/References:
[1]夏建芳,涂星..圆形料场堆料机臂架有限元分析[J].郑州大学学报(工学版),2011,32(02):46.[doi:10.3969/j.issn.1671-6833.2011.02.012]
[2]刘立新,汪小林,于秋波,等.疲劳荷载作用下部分预应力混凝土梁的挠度研究[J].郑州大学学报(工学版),2007,28(04):4.[doi:10.3969/j.issn.1671-6833.2007.04.002]
LIU Lixin,Wang Xiaolin,YU Qiubo,et al.Study on deflection of partially prestressed concrete beams under fatigue loading[J].Journal of Zhengzhou University (Engineering Science),2007,28(03):4.[doi:10.3969/j.issn.1671-6833.2007.04.002]
[3]杨永战,方波,任日忠,等.基于系统识别的梁类构件故障诊断[J].郑州大学学报(工学版),2002,23(03):110.[doi:10.3969/j.issn.1671-6833.2002.03.031]
Yang Yongzhan,Square wave,Ren Rizhong,et al.Fault diagnosis of beam components based on system identification[J].Journal of Zhengzhou University (Engineering Science),2002,23(03):110.[doi:10.3969/j.issn.1671-6833.2002.03.031]