相似文献/References:
[1]李宗坤,吴赛,李定斌,等.南水北调中线工程潮河段征迁安置风险分析[J].郑州大学学报(工学版),2016,37(04):57.[doi:10.13705/j.issn.1671-6833.2016.04.013]
Li Zongkun,Wu Sai,Li Dingbin,et al.Risk Analysis of Land Requisition and Resettlement in Tidal River Section of the South to North Water Diversion Middle Route Project[J].Journal of Zhengzhou University (Engineering Science),2016,37(02):57.[doi:10.13705/j.issn.1671-6833.2016.04.013]
[2]李宗坤,王特,葛巍,等.基于WBS-RBS和AHP的港珠澳大桥人工岛建设风险分析[J].郑州大学学报(工学版),2020,41(03):62.[doi:10.13705/j.issn.1671-6833.2020.02.019]
Li ZongkunWang TeGe WeiSong Ziyuan.Risk analysis of artificial island construction of Hong Kong-Zhuhai-Macao Bridge based on WBS-RBS and AHP[J].Journal of Zhengzhou University (Engineering Science),2020,41(02):62.[doi:10.13705/j.issn.1671-6833.2020.02.019]
[3]陈根永,孙栗,彭勇,等.基于层次分析法的郑州新区电压等级序列优化研究[J].郑州大学学报(工学版),2011,32(06):121.[doi:10.3969/j.issn.1671-6833.2011.06.029]
[4]张延欣.功能评价的一种新方法——AHP在价值工程中的应用[J].郑州大学学报(工学版),1990,11(04):116.
Zhang Yanxin,A new method of functional evaluation -the application of AHP in value engineering[J].Journal of Zhengzhou University (Engineering Science),1990,11(02):116.
[5]贺北方,刘正才.水利工程经营管理综合评判的多级模糊层次分析[J].郑州大学学报(工学版),1988,9(02):23.
[J].Journal of Zhengzhou University (Engineering Science),1988,9(02):23.