[4] GNDZ M,NIELSEN Y,ZDEMIR M.Quantification of delay factors using the relative importance index method for construction projects in Turkey[J].Journal of management in engineering,2013,29( 2) : 133-139.
[5] IYER K C,SAGHEER M. Hierarchical structuring of PPP risks using interpretative structural modeling[J]. Journal of construction engineering and management, 2010,136( 2) : 151-159.
[6] AMINBAKHSH S,GUNDUZ M,SONMEZ R. Safety risk assessment using analytic hierarchy process ( AHP) during planning and budgeting of construction projects[J]. Journal of safety research,2013,46: 99 -105.
[7] PENG W,SHEN L F. Managing transportation megaproject schedule risks using structural equation modelling: a case study of Shanghai Hongqiao integrated transport hub in China [J]. MATEC web of conferences,2016,81: 03005.
[8] THAPANONT P,SANTI C,PRUETHIPONG X.Causes of delay on highway construction projects in Thailand [J].MATEC web of conferences,2018,192: 02014.
[9] 李晓争.基于解释结构模型的铁路智能运输系统体 系结构研究[D]. 北京: 北京交通大学,2007.
[10] 初旭新,宗刚,彭朝霞,等. 基于 ISM 的道路交通安 全影响因素研究[J]. 安全与 环 境 学 报,2017,17 ( 5) : 1668-1672.
[11] 亓莱滨,张亦辉,郑有增,等.调查问卷的信度效度 分析[J].当代教育科学,2003( 22) : 53-54.
[12] 华斌.贝叶斯网络在水电机组状态检修中的应用研 究[D]. 武汉: 华中科技大学,2004.
[13] CASTILLO E,GUTIERREZ J M,HADI A S.Sensitivity analysis in discrete Bayesian networks[J].IEEE transactions on systems,man,and cybernetics: part A systems and humans,1997,27( 4) : 412-423.
[14] WARES A. Challenging problems in Euclidean geometry[J].International journal of mathematical education in science and technology,2020,51 ( 4) : 626 -630.