相似文献/References:
[1]朱海堂,张启明,李春跃.桩与桩帽连接节点受弯承载力计算[J].郑州大学学报(工学版),1998,19(04):52.
Zhu Haitang,Zhang Qiming,Li Chunyue.Calculation capacity of piles and pile hats connecting nodes is bent[J].Journal of Zhengzhou University (Engineering Science),1998,19(04):52.
[2]张启明,荆亚丽.桩与桩帽连接节点受变特性的试验研究[J].郑州大学学报(工学版),1997,18(02):56.
Zhang Qiming,Jing Yali.Test research on the characteristics of piles and pile hats connecting nodes[J].Journal of Zhengzhou University (Engineering Science),1997,18(04):56.
[3]王恒栋,丁自强,赵广田.预应力砼管桩与桩帽连接节点轴拔性能试验研究[J].郑州大学学报(工学版),1996,17(02):37.
Wang Hengdong,Ding Ziqiang,Zhao Guangtian.Research on the performance test of prestressed concrete pipe piles and pile caps[J].Journal of Zhengzhou University (Engineering Science),1996,17(04):37.